We’ve not been updating…. PP and I are both very very tied up with work, renovating and moving to the new place. We’ll be sure to update you guys soon. The renovating jobs will be complete by today and we’re moving in the weekend. Be sure to visit us again for more of our house pics. Ciao.
Let’s continue with our sterling@pj exclusive report, part 2 = inspection of our new house.
This is our first time doing new house inspection, however, we have asked Leonard for his experience since he found 1xx defects for his new house
kekeke…
We have brought the following tools:
- Masking tape - Mark the number on masking tape and stick on the defect. This way is visible and easy to be removed without leave any mark.
- Red marker pen - No need to explain further, to write down the number on masking tape.
- Torch light - this is a must to light up those dark areas to check the defect thoroughly.
Now let us show you some photos of our unit.

01. Looking up from inside of Sterling.

02. The lift lobby quite spacious.

03. The main entrance of our unit, the original 8ft door is very nice and classy. The quality is very good.

04. Living hall, view from main entrance.

05. Main and kitchen entrance, view from balcony.

06. This is the yard. Very small. We actually want to put 2 air con compressors at the same time, we need to dry our clothes here. Not sure got enough space or not.

07. Kitchen. Saw the wall and door? We have planned to knock it down so we will relocate the sink and water inlet and outlet in front of window.

08. Balcony.

09. We like the sliding door especially the greenish color.

10. Looking down from our balcony. Opposite is Kelana Business Center.


11. This is our master bed room. Actually is not big enough to put in a king size bed.

12. Our master bed toilet, we like the color of the tiles.

13. The original shower head is pretty good in quality.

14. However, the basin is super small size.

15. We will built a wardrobe at the corner there.

16. This is second room. Third room also the same.

17. The corridor is very near our yard. So we will install a sliding window and grill to prevent theft.

18. Looking out from second room is lift lobby.

19. Second toilet.

20. Utility room window.

21. Once we knock down the door wall, our kitchen will have more space.

22. Last but not least, here are the defects of our unit. Click the thumbnail to view the large photo.
Too bad, since 26 April 2008 until today, we are still waiting for CF from developer. Damn…. they already start charging us for maintenance fee but we can do anything for almost 2 months already……
On 26 April 2008, we have collected the key for our very first house and did the inspection on the same day.
Our appointment was around 1pm but we were there 10am because we want see Ernest (my colleague) how he do his inspection since this is his 2nd house, sure he got a lot of experience to share. Around 12pm, we leaved his unit and go to office to meet up with the officer to get our keys.
Before that, we walk around the condo to see the environment and what kind of facilities Sterling is providing. See the photos that I have captured that day.

01. Outside of Sterling PJ

02. Tennis Court

03. Playground for kids

04. Another view from insert of Sterling PJ

05. This is terrace unit and the extra land cost RM40K. wow !!!

06. Nice garden surrounding Sterling PJ

07. Stepping stone, good for your health

08. The infinity end swimming pool

09. The main entrance and drop off point

10. Another water feature in front of drop off point

11. Another view of swimming pool and club house. Gym facilities are in the club house

12. The rain type shower head at pool side

13. Another view of swimming pool and block A

14. Even the sign board got Sterling PJ’s logo

15. Exercise corner

16. Bottom up view of Sterling PJ
That’s all for now… we will continue post the photos of our unit and the result of inspection.
Stay Tuned!!!



