Sep
22
category category : homie     comments 2 Comments »    by philipcs

tags  tags :

After 2 months break in blogging and we are back now. We are busy with our home sweet home in these 2 months and really go out to search for new good food. After we have settled down, we will start our mission again :)

So now, we are sharing with you what we are doing for our home these 2 months.

As mentioned in title, the tedious stage for new home is renovation. We need to plan, manage our budget, chase the contractor since they are TOO BUSY as well. We almost went back to our condo to spot check every lunch time during the renovation period to ensure the contractor do exactly what we want.

First thing to do is the wiring for new power points, wiring for lighting, air con.

As we mentioned in previous post we will hack/remove the door and wall between kitchen and yard to create bigger space for kitchen. Check out how messy is this work.

Follow by air con piping concealment work.

Plaster ceiling work, this is pretty simple and fast, 1 and half day complete the work.

That’s all for now and we will share the photos after the renovation work completed and interior decoration after we have moved in.

Related Posts with Thumbnails
Share

2 Responses to “sterling@pj exclusive report #3 : renovation”

  1. johnny ong

    do u still have the breakdown of the renovation cost? abt to get my new hse next month so i’m reading ard for such cost so that i get to negotiate with the contractor

  2. Benjamin

    Hi Philipcs,
    How’s your renovation going on?
    Has the contractor done a good job for you, if so, please forward us his contact detail if you don’t mind. Thanks.

    Btw, congrat for your new home sweet home.

    Cheerio!

Leave a Reply

     
advertisements

advertise with lessthanten
Earn $$ with WidgetBucks!
google advertisement
google advertisement
Text Link Ads
text link ads
XHTML | CSS | Copyright © 2007 - LessThanTen.net | Powered by Wordpress | Design by philipcs.com