Let’s continue with our sterling@pj exclusive report, part 2 = inspection of our new house.
This is our first time doing new house inspection, however, we have asked Leonard for his experience since he found 1xx defects for his new house :D kekeke…

We have brought the following tools:

  • Masking tape – Mark the number on masking tape and stick on the defect. This way is visible and easy to be removed without leave any mark.
  • Red marker pen – No need to explain further, to write down the number on masking tape.
  • Torch light – this is a must to light up those dark areas to check the defect thoroughly.

Now let us show you some photos of our unit.


01. Looking up from inside of Sterling.


02. The lift lobby quite spacious.


03. The main entrance of our unit, the original 8ft door is very nice and classy. The quality is very good.


04. Living hall, view from main entrance.


05. Main and kitchen entrance, view from balcony.


06. This is the yard. Very small. We actually want to put 2 air con compressors at the same time, we need to dry our clothes here. Not sure got enough space or not.


07. Kitchen. Saw the wall and door? We have planned to knock it down so we will relocate the sink and water inlet and outlet in front of window.


08. Balcony.


09. We like the sliding door especially the greenish color.


10. Looking down from our balcony. Opposite is Kelana Business Center.



11. This is our master bed room. Actually is not big enough to put in a king size bed.


12. Our master bed toilet, we like the color of the tiles.


13.
The original shower head is pretty good in quality.


14.
However, the basin is super small size.


15. We will built a wardrobe at the corner there.


16. This is second room. Third room also the same.


17. The corridor is very near our yard. So we will install a sliding window and grill to prevent theft.


18. Looking out from second room is lift lobby.


19. Second toilet.


20. Utility room window.


21. Once we knock down the door wall, our kitchen will have more space.



22. Last but not least, here are the defects of our unit. Click the thumbnail to view the large photo.

Too bad, since 26 April 2008 until today, we are still waiting for CF from developer. Damn…. they already start charging us for maintenance fee but we can do anything for almost 2 months already……

Related Posts with Thumbnails
Share

4 Responses to “sterling@pj exclusive report #2 : inspection”

  1. Simon Seow

    Nice crib.

  2. lessthanten » Blog Archive » sterling@pj exclusive report #3 : renovation

    [...] we mentioned in previos post we have remove the door and wall between kitchen and yard to create bigger space for kitchen. Check [...]

  3. Hakim Amir

    Hi Philip, the defects that you listed… were they later on fixed/repaired by the developer?

    thanks

  4. philipcs

    Hi Hakim,

    Yes, they fixed all the defects!

Leave a Reply

     
advertisements

advertise with lessthanten
Earn $$ with WidgetBucks!
google advertisement
google advertisement
Text Link Ads
text link ads
XHTML | CSS | Copyright © 2007 - LessThanTen.net | Powered by Wordpress | Design by philipcs.com